Regulated AHU commissioning

Affected products:

CADO-Integral-VLEX


Description Service code NET fixed price excluding VAT to 01/08/23
CTA: 3 units maximum 078011

€ 750.00

CTA: additional unit 078024 € 200.00

Service:

1 - Visual inspection to verify the installation
  • Installation, access to control devices and components to be replaced.
  • Direction of air flow.
  • Number and positioning of probes.
  • On hot water model: position of the temperature probes on the hot water outlet.
2 - Checking the electrical circuits
  • Network voltage, current, power and protection of the line, earthing.
  • Conformity of the connection of the electrical circuits, the probes and the remote control.
  • Direction of rotation of the fan (s).
3 - Starting up the device
  • Entering parameters into the remote control.
  • Adjustments of set points and physical measurements of intensities, flow rates / pressures and temperatures.
  • Control of air flow direction.
  • Clock setting (depending on models).
  • Battery operating tests based on different set point temperatures.
  • Function tests of the exchanger: rotation control for wheel exchangers.
4 - Information
  • Presentation of the functionalities of the device.
  • Submission of the technical intervention report.

Packages valid for Metropolitan France including 1 trip per unit. Intervention outside the continent: contact us.
Our after-sales service follows your file from the organization of the intervention to the transmission of the commissioning report.

Contact
sav@vim.fr - Phone : 05 49 06 60 25 or 05 49 06 60 14
X